The CPSR Diaries

If a type of criteria is located to own a major deficiency, the contractor’s overall system is deemed for being unacceptable. In such cases, not only need to the contractor receive consent to subcontract, in accordance with DFARS 252.242-7005, which is needed to get A part of CAS protected con
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15